close
close

ActionSA’s ‘Sh****y Tour’ to highlight sewage problems in Cape Town

As the party began its ‘Sh****y Tour’ in Cape Town, ActionSA lamented the state of what they called failed sewage infrastructure, which was causing misery for residents.


Also read: Nomzamo residents threaten election boycott due to sewage crisis


This follows the City’s announcement on Tuesday of the installation of 37 cutting-edge 12KW inverters at 27 pump stations to help prevent sewer spills.

According to the City, the R10.9 million investment will also help to strengthen its resilience to loadshedding.

ActionSA’s Michael Beaumont told IOL that, as a member of Team Fix SA’s Infrastructure Committee, he has toured our country’s water, road and rail infrastructure and that it is now appropriate to begin with sewage as one of the most serious issues undermining South African dignity.

Beaumont began his tour of Simon’s Town on Monday morning, following reports of sewage spills on beaches.

Unleash your inner explorer with these incredible car deals, all priced under R100 000. Find car listings here.

He emphasised that the number of tourists has decreased from 7.9 million in 2015 to 800 000 in 2023, owing primarily to an inability to deal with a sewage crisis.

He stated that this should serve as a stark warning to Western Cape residents and that it was entirely appropriate that this tour begin in Cape Town, given the ‘astonishing’ videos they had seen from the air of raw, untreated sewage flowing into a protected marine reserve.

They claimed that authorities had ‘not played honestly in this matter’ by attempting to mislead the public into believing that the sewage had been treated.

Beaumont stated that they would also be visiting Nomzamo in Strand, a community that has dealt with sewage pooling.

However, the City stated that the inverter installations were part of a strategic project that began in July 2023 with the goal of reducing sewer overflows, particularly during power outages.

Each inverter includes at least one battery, which can provide up to four hours of backup power and has a lifespan of up to 20 years.

Zahid Badroodien, Mayco member for water and sanitation, denied that the City was ‘misleading the public’, stating that a recent independent audit of the Hout Bay, Camps Bay and Green Point marine outfalls found that the pre-treatment facility is 97% compliant with all parameters.

‘Public information meetings regarding the marine outfalls were held, providing transparent and comprehensive information to all stakeholders, including representatives from ActionSA,’ he said.

‘During these engagements, the City consistently communicated that preliminary fine screening occurs before discharge at all marine outfalls.’

‘This means that the outfalls discharge wastewater into the ocean only after undergoing degritting and screening processes.’

Cape {town} Etc discount: Get a lunchtime facelift at S&S Aesthetics for R2 499 (valued at R3 950). Get the deal here.

Also read:

City workers robbed during sewage repair in Elsies River

Picture: Zahid Badroodien / Facebook

 



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *